Renovate Bldg. 665 West Point

Ranco Construction performed in this project was done as a major subcontractor, and included all of the elements required in the proposed Seed Project, including (but not limited to): site inspections; installation, leakage and deflection testing, and post-installation testing and remediation of sewer pipe; installation and testing of High Density Polyethylene (HDPE) sewer pipe manhole re-parging and waterproofing. Site preparation for the work included the use of ground-penetrating radar and CCTV inspection (including as-builts and CAD drawings) as needed to ensure adherence to prevailing safety regulations and work scope requirements.

Call Now Button(609) 801-1808 Scroll to Top